Wednesday, July 4, 2012

LAND LINE Closing in CLARITY…..

·        Select the ‘Service Orders’ from the Provisioning Menu..






  •    Click on Find button then click and Enter Tel. No. in the ‘Tel. No. Text box’ (Green Colour) Again Click on Find button

·        We will get the task details which we have to do for the closing of the Work order


·       See, here the first task, ie. ‘Identify Lineman’ we can  complete now, because the Status is in the ‘INPROGRESS’: Click on Navigator button.

·       In the new message box , double click on ‘Select Lineman’

·       Check, whether the lineman details are correct or not. If yes, give OK otherwise we have to change the Lineman, using the Search button.
 ·       We will get one message like the following. OK.
·       See, here we can complete the task now. Click on save button and for closing the Task, Click on ‘View WO’ button.
·       Select the ‘Completed’ option from the new window. OK.

  1. * Save and Give Refresh (F8). Now the First task is completed.
·       While saving, you will get the message like the following.
·        Now, the next task ie. OUTDOOR. It is in Assigned state. We can’t update/edit at the time of ‘Assigned’. Wait for ‘INPROGRESS’. For that try Refresh (F8)
·       Now, the OUTDOOR task is in INPROGRESS. Click on  Navigator.
·       In the new window, Double click on ‘Circuit Edit Screen’
·        Here, Already one entry that is ‘40 Physical’ is there, we can enter the remaining entries like 10 DP, 20 Pillar, 30 MDF otherwise remove all the old entries in the cross connections list and enter as new .
·       Change the number 10 in the place of 40, Click on 2nd  Textbox  and Click on LOV.

·      In the list select ‘JUMPER’ and ok.
·       Click on 3rd Box. i.e Location and Click on LOV.

·       Here, search our Exg. Type the first few letters with % and search. For Eg. BGLVNP%

·      Select the DP from the List. OK.
·       By using LOV button select the next columns ie. Type: DP-DL and
Index: 001

·       Click next box and give LOV. Select the Network Element and OK.

·       Here select the option from FRONT
·       Now, DP entry is over, Enter Pillar details: Enter 20 and Select JUMPER like DP entry, click on location Textbox and Click on LOV.
·      Select Line side details i.e. OUT.

·       Select the Details.

·       Now, ‘To’ entry in the Pillar details. Use LOV and Select Location, type, index etc as like left side entry. Select E_side from LOV.

·       Now, Pillar details entry is over. Enter MDF Details.

·       Enter 30, and Select JUMPER from LOV.

·      Select Location by clicking LOV.
·      Select Type and Index by LOV.

·       Select the MDF Point by LOV.
·       Now Indoor details: Enter 40 as next and Select ‘PHYSICAL’ by LOV.

·        Click on the ‘Location’ and Select switch detail from LOV: for searching entering as BGLVNPC% (here C for CDOT): Select and give OK.
·       Now the selection of TEN: Click inside the Textbox and Click on LOV.

·       Select and OK
·      Select your TEN, ok.
·      Save the Task.

·       Now click on ‘View WO’ button

·       Now we have to change the task from ‘Assigned’ to ‘Closed’. Click in the Assigned Text Box and use LOV. Afterwards Save it.
·       Task showing still in ‘In Progress’ Click Refresh (F8.)
·       Now the Out door task is completed and Next task is in the Assigned State.
·        Click F8 button continuously, the next task will come ‘in progress’. Click on the ‘View WO’button. The following window will come. Click on ‘Attributes’ Tab.
·        Click on the ‘MD_IS_LINE_OK’ Textbox and use LOV.

·        Select the ‘Y’ option and OK.
·        Save it and close the Work order. Click in the Assigned Textbox and LOV, select ‘Closed’. Ok.
·       Give yes and save it.

·       Refresh (F8) for Task completion.
·        Next two Work orders are Manual orders. If the number created in the switch, the Indoor staff can close the order.  Click on ‘In progress’ and use LOV.

·       Select ‘completed’ and ok.

·       Save and Refresh (F8)

·       Now last task, Refresh for ‘In progress’
·       Click on the ‘In progress’ and use LOV.
·       Select ‘Completed’ OK and Save it.
·       Refresh for Completion.
 Thank you...